美国土木工程师学会期刊
期刊
会议
图书
作者:Liyuan Zhao , Shuxian Wang , Jialing Wei ...
来源:[J].Journal of Urban Planning and Development(IF 0.946), 2020, Vol.146 (3)
摘要:AbstractBecause proper urban planning and design can improve transit sharing, the impact of the built environment on transit use has attracted the attention of many researchers. Factors with different geographical scales such as individual characteristics, neighborhood built envi...
作者:Tyler Fricker
来源:[J].Natural Hazards Review(IF 0.78), 2020, Vol.21 (3)
摘要:AbstractTornadoes create a threat to human life. Knowing the conditions that make people vulnerable to this threat is vitally important. Yet, socioeconomic and demographic data are not consistently available at the tornado level, making it hard to obtain this knowledge. In r...
作者:Farah Demachkieh , Salam Khalife , Mohamed-Asem Abdul-Malak ...
来源:[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2020, Vol.12 (3)
摘要:AbstractDelays and disruptions that frequently lead to cost overruns on, and late completion of, construction projects are often accompanied by claims for time extensions and/or additional compensations by construction contractors. To this effect, contractors’ claims can bec...
作者:Dana Sexton , Islam H. El-adaway , Mohamad Abdul Nabi ...
来源:[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2020, Vol.12 (3)
摘要:AbstractThe US Air Force (USAF) introduced the Simplified Acquisition of Base Engineer Requirements (SABER) contract to fast-track the time required for both the engineering design and the acquisition process mainly associated with USAF’s maintenance and repair work projects...
作者:Hao-Che Wu , Alex Greer , Haley Murphy
来源:[J].Natural Hazards Review(IF 0.78), 2020, Vol.21 (3)
摘要:AbstractOklahoma residents have experienced an increase in moderate-scale earthquakes (magnitude 3–5) regularly since 2011. Recently, several scientific reports showed that seismic activities are likely associated with oil companies’ wastewater injection wells. Given that re...
作者:Piyius Raj Singh , Vincente Pericoli , Amit Kanvinde ...
来源:[J].Journal of Pipeline Systems Engineering and Practice, 2020, Vol.11 (3)
摘要:AbstractCast iron pipe break rates in North American water distribution systems have increased significantly in the last six years (a 43% increase with respect to 2012). Of the numerous mechanisms that are responsible for these breaks, pipe fracture data from the City of Sac...
作者:Michel Guévremont , Amin Hammad
来源:[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2020, Vol.12 (3)
摘要:AbstractFour-dimensional (4D) simulation is not frequently used in courtrooms because it is considered costly, complex, and risky. The experience in litigation systems reveals that many expert witnesses at present are not familiar with 4D simulation and are reserved about us...
作者:Sanket Rawat , Ravi Kant Mittal , G. Muthukumar
来源:[J].Practice Periodical on Structural Design and Construction, 2020, Vol.25 (3)
摘要:AbstractThe case of isolated rectangular footings being subjected to eccentric loads along both directions is very conventional as columns are ordinarily subjected to horizontal loads, vertical loads, and moments simultaneously. Also, its design has not been of much concern for e...
作者:Jianhua Wang , Zhaohuan Yang , Yangrui Zhou ...
来源:[J].Journal of Pipeline Systems Engineering and Practice, 2020, Vol.11 (3)
摘要:AbstractIn subsea pipeline engineering practice, the total stress or alpha approach, which assumes that the axial resistance to pipeline walking in fine-grained soils such as soft and very soft clays for a specified type of coated pipe varies primarily with the undrained she...
作者:Ajit K. Sinha , Kumar Neeraj Jha
来源:[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2020, Vol.12 (3)
摘要:AbstractConstruction litigation in the infrastructure sector has long had the potential of locking in investments. The court case in this study finally ended, with the judgment delivered by the high court of Delhi, on March 16, 2012. The court itself took 2.25 years to adjud...

我们正在为您处理中,这可能需要一些时间,请稍等。

资源合作:cnki.scholar@cnki.net, +86-10-82896619   意见反馈:scholar@cnki.net

×